-
```
As-is:
Link events (BPMN 1.1) are currently treated just like all other
intermediate events. This might lead to unexpected behavior in the
step-through simulation and does not enforce certain cons…
-
```
As-is:
Link events (BPMN 1.1) are currently treated just like all other
intermediate events. This might lead to unexpected behavior in the
step-through simulation and does not enforce certain cons…
-
```
As-is:
Link events (BPMN 1.1) are currently treated just like all other
intermediate events. This might lead to unexpected behavior in the
step-through simulation and does not enforce certain cons…
-
https://github.com/camunda/camunda/blob/955ceae9f3282dcc476dd61ce0c22e739aa587bc/zeebe/bpmn-model/src/main/java/io/camunda/zeebe/model/bpmn/validation/zeebe/SubProcessValidator.java#L55-L57
The BPM…
falko updated
2 months ago
-
__Describe the Bug__
Hi. I’m trying to add Message Start Event (non-interrupting) together with SubTask to the diagram.
The problem is the “MessageStartEvent (non-interruptig)” visually looks like…
-
### What should we do?
As a followup to https://github.com/bpmn-io/bpmn-js-properties-panel/issues/1069, we should add a documentation link to point to priority docs.
### Why should we do it?
…
-
Hi Oliver,
I was thinking about a piece of code that will be able to load a BPMN process, then build a js skeleton definition from it, so that we could add our business specific code to handle transi…
-
### Problem you would like to solve
Camunda 8 versions are currently set individually for each BPMN diagram, DMN diagram and Camunda Form. Since a process application is going to deployed as a whole …
-
## Description
In Camunda Process Test, I want to trigger a BPMN timer event. Assuming that a timer event has a duration of 1 hour, I want to trigger the timer event immediately instead of waiting un…
saig0 updated
1 month ago
-
right now the bpmn xml for user tasks can look like this with our extensions:
```xml
false
# Thanks
We hear …