Open davidzbiral opened 3 months ago
@jancimertel @adammertel Very intense CASTEMO work expected for 27-31 May, and last time slow response (turning wheel) slowed us down by easily 50% of the time, it was frustrating. Realistic to do the move quickly, e.g. until Monday noon, or not and needs a lot of testing or something, or there is a danger of it not functioning at first, which would slow us down even more? Some will already start working, so needs good coordination.
@davidzbiral we do not think this is a good idea as:
@adammertel OK, let's give it more time, anyway the period of intense work (= this week) is not good for this move. Leave in Finetuning or move to 1.4.1 at your convenience.