Closed Industry4 closed 1 year ago
If the supervisory connections are down, PCB validations will fail. It's best for the Operator to be prompted before a lookup, if the connection has failed.
If the supervisory connections are down, PCB validations will fail. It's best for the Operator to be prompted before a lookup, if the connection has failed.