Grain & Fiber N Study 2022 SOP #81

Closed AjitWX closed 1 year ago

AjitWX commented 2 years ago

Project Overview

To Do: Review check list

Project Objectives - To determine EO hemp (Cannabis sativa) response to applied nitrogen. Project Description - Grain & Fiber N Study Project Protocol - 3 varieties x 6 rates x 4 reps. (18 trt). (72 plots.) Field size: L 242' x W 160’. (0.89 ac). Plot size: L 25' x W 12'. (300 sqft). Field Design - RCB with 4 reps. Blocked by replication. Field Diagrams - Maps can be found on TEAMS. Projected Start Date- Early May. Projected End Date- September/October. Project Manager(s)- Ajit, Tamara, Daniel. Projected Planting Date- 5/18-19. Crop(s)- Hemp: Essential oil - cv. Abound, SS-Beta, Yuma Irrigation - Solid set: over-head sprinklers. Applications - Six (6) Nitrogen treatments, split between **four (4) applications. Planting methods - Center of mounds. Earthway manual mechanical seeder. Data Collection & Sampling - Project Maintenance - Weeding as needed. Equipment needed - Moldboard plow, Harrow disk, raised bed shaper, roto-tiller, herbicide wagon, others - TBD. Field crew assistance - Yes. For irrigation and land preparation. _

Land Request

Preferred block- Block 1.
Section- South.
Area/Acres requested-L 242' x W 160’. (0.89 ac).
Greenhouse - No. 

To Do: Update check list -[] Complete TREC Land Request -[] Complete TREC Greenhouse Request -[] Request faculty sponsor to complete UFarm request.

Land Preparation

Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) - Standard cultivation. Row Length - L 25' x W 12'. (300 sqft). In-Row Spacing - ? Between-Row Spacing - 1.5' Field Buffers - 30-40'. Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) - Yes. Earthways. Transplants? - No. Support Structure (Rebar, String, etc.) - No. Plastic Mulch? - No. Full image of field layout, design, and plot arrangement - Maps and layouts can be found on TEAMS. Date to complete land preparation - 5/17-18. To Do: Update check list -[] Complete TREC field preparation request -[] Row Crop -[] Plastic Culture

Irrigation

Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) - Drip tape. Two lines per bed. 
Solid set? (overhead irrigation, micro-sprinkler) - Solid set - overhead.
Irrigation Timing (frequency and trigger) - As needed*
   *[Once per week for the first 2-3 weeks to germinate and establish**].
Irrigation Amount (per application) - 1 inch.

To Do: Update check list -[] Complete TREC fieldwork request for irrigation.

Fertilizer Application

Label Name - Urea (N), Triple Super Phosphate (P), Sulfate of Potash (K)
Analysis rates (NPK, etc.) - 46-0-0 (N), 0-46-0 (P), 0-0-50 (K)
Application rate per acre:

What could possibly go wrong?