As VA stakeholder of CMS, I need to understand how the results of the Q3 editor survey will be presented in a report, so that I can provide feedback and guidance before it is finalized and sent out.
Description or Additional Context
The editor survey data has been synthesized and now the findings need to be put into a report that, eventually, VA stakeholders of CMS will review. Since this is the first time the CMS team has sent out this survey, there will need to be back-and-forth between CMS team and VA stakeholders before the report is finalized and sent to VA-at-large.
Per Erika Robbins:
Just FYI - I rechecked my notes and wanted to share that we are not required to use VIEWS in order to share the survey results with the unions. This will save us a lot of time and effort.
The survey results can be sent directly to our Labor Union POC via email when they are ready.
Here is his information in case you need it, but I can also send them for you. :slightly_smiling_face:
Michael Doucette
Labor Relations Specialist, Office of Labor Management Relations
Steps for Implementation
Collaborate with platform team so that we can use their framework that was created by the platform team for platform survey.
Gather feedback from VA POs about the format and location of the report.
Gather feedback at the Editor Survey Weekly Check-In from VA POs about what is needed in the report.
Put the feedback and results of the survey synthesis into report.
Acceptance Criteria
[ ] A draft report is created that synthesizes the results of the Q3 survey for VA stakeholders to review and provide feedback.
User Story or Problem Statement
As VA stakeholder of CMS, I need to understand how the results of the Q3 editor survey will be presented in a report, so that I can provide feedback and guidance before it is finalized and sent out.
Description or Additional Context
The editor survey data has been synthesized and now the findings need to be put into a report that, eventually, VA stakeholders of CMS will review. Since this is the first time the CMS team has sent out this survey, there will need to be back-and-forth between CMS team and VA stakeholders before the report is finalized and sent to VA-at-large.
Per Erika Robbins:
Steps for Implementation
Acceptance Criteria