Closed techninja closed 8 years ago
Obviously all deadlines have been thrown out the window. Constant intrusions into daily life have destroyed my ability to keep this update on track. The good news is great strides have been made:
I've begun work on a new Electron project, the PancakeCreator, and though it's in its infancy, it will be blossoming in the weeks to come and will surely bring new and amazing features/ways of doing things cleanly and quickly.
Can you please build a copy so that I can test it with Snap support?
Will do tonight. If you're testing other things as well, currently interesting/missing/wrong/spotty:
I'm headed off to MakerFaire NY on Wednesday, so I'm not sure how much time I'll have to test it this week, but I would appreciate the build, and I will look at each of those things.
Awesome! For fun I'll include Spiral mode for playing with.
Ok, Here it is: RoboPaintMac_v0.9.6_TEST.dmg
This pulls all modes from actual separate repos! It's amazing, and awesome. Check out my new NPM namespaces: https://www.npmjs.com/~techninja Also:
There's a number of things that are wonky, but known:
And more, I'm sure. Also I don't think this is 0.9.6. This is bound to be a major revision, possibly even 2.0 if we decide it because it's so massively different, and even likely to automatically close a number of tickets in the issue queue right now.
You sure closed a heck of a lot of tickets-- it took me a long time just to read through them!
I'll prioritize testing here as soon as we're back from Maker Faire. :)
Closing this for the sake of 2.0 beta and future releases.
This issue is a placeholder for the work and discussion behind the next release and should act as a tracker for any release delays or important points about the build not already ticketed.
This release supersedes the previously planned 0.9.7 feature release, fixing more critical/important issues above feature additions. 0.9.7 was set drastically off track by numerous factors involving feature implementation complexities and personal issues, leading up loss of my main source of income early in April.
0.9.6 has been identified as the plan to fix any major blockers before the next feature release, though it's been hard to pin down everything that goes with it, the milestone should hold the basics of what's required before release, though not the timing.
Whatever I seem to set as the goal just slips away, though I knew April-May 2015 would be tricky, I had no idea I'd get thrown for yet another loop in the form of trying to find a job. Regardless, the last major time crunch is upon us with my leaving for a whirlwind book tour with @makersylvia across Australia for 2 weeks starting May 29th (returning June 15th or so). Of course if there's a power outlet available on the 18hr flight, I might actually be able to get some work done ;)
Will list the tickets of issue and their status later on, I just wanted to make sure this issue was created at a minimum.