A PEGS requirement is traceable if it is possible to follow its consequences, both ways, in other project artifacts including design, implementation and verification elements.
[ ] Requirements and artifacts have bidirectional links
[ ] Outcomes (G.3) should not be orphaned
[ ] Functionality (S.2) should reference G.3 and G.4
[ ] Verification and Acceptance Criteria (S.6) should reference goals and functionality
A PEGS requirement is traceable if it is possible to follow its consequences, both ways, in other project artifacts including design, implementation and verification elements.