As described in #486, there are situations where a crawl spans a month end/start or there is a delay between a test crawl being run and the decision to save it. This leads to the crawl missing getting downloaded/registered.
To avoid this, make the minimum embargo date possible 1 month instead of 0 months.
As described in #486, there are situations where a crawl spans a month end/start or there is a delay between a test crawl being run and the decision to save it. This leads to the crawl missing getting downloaded/registered.
To avoid this, make the minimum embargo date possible 1 month instead of 0 months.