Open jmcanterafonseca opened 5 years ago
The scope of this issue is the basic operation without optional or advance features taking into account NGSIv2 interoperability aspects, i.e. a kind of "minimum viable operation" (borrowing the term MVP from lean methodologies). Advances/optional features in the operations are deferred to future issue.
Section 6.4.3.1 of the ETSI Specification
https://www.etsi.org/deliver/etsi_gs/CIM/001_099/009/01.01.01_60/gs_CIM009v010101p.pdf