Closed shawa closed 7 years ago
Added the new features and reordered everything to be the same as the csv.
Left out the amortised costs - I guess we can figure that out after we have our actual estimates?
@andrewbutterfield Attached are our bids for release 2. I will comment below with a table for convenience too. Group-5-Release-2-Bidding.xlsx
Urgent | Feature | Cost | ||||
---|---|---|---|---|---|---|
u | Mock DDI Characterisation Data | 20 | ||||
Identify drugs in PML | 0 | |||||
Lookup drugs in DINTO | 0 | |||||
Faster DINTO Loading | 5 | |||||
Identify DDIs | 0 | |||||
u | Report un-named PML construct | 15 | ||||
u | Report PML construct name-clash | 20 | ||||
Report use of task construct | 8 | |||||
Identify Sequential DDIs | 20 | |||||
Identify Parallel DDIs | 20 | |||||
Report Alternative non-DDIs | 30 | |||||
Report Repeated Alternative DDIs | 33 | |||||
Specifying Periodic Drug Use | 38 | |||||
Specifying Sequential Drug Use Gap | 50 | |||||
Specifying Parallel Drug Use Gap | 50 | |||||
Specifying Repeated Alternative Drug Use Gap | 50 | |||||
Specify a Delay | 30 | |||||
Specify a time interval offset | 35 | |||||
Report Timing Inconsistencies | 120 | |||||
Handle Timed Self-Interactions | 135 | |||||
Identify DDI Closest Approach | 60 | |||||
Identify DDI Furthest Separation | 60 | |||||
Merging Clinical Pathways written in PML | 33 | |||||
u | PML-TX Save PML to File | 15 | ||||
Pathway Badness Ranking | 180 | |||||
PML-TX Gradient Descent Time Optimisation | 200 | |||||
PML-TX Brute Force Time Optimisation | 200 | |||||
PML-TX Rule-Based Transformation | 190 | |||||
Independent | Amortized | Rule Based | ||||
PML-TX Reorder Sequence | 120 | 50 | 20 | |||
PML-TX Serialise Branch (Naive) | 105 | 7 | 20 | |||
PML-TX Serialize Branch (Two-Way) | 105 | 7 | 20 | |||
PML-TX Serialize Branch (Three-Way) | 110 | 7 | 20 | |||
PML-TX Serialize Branch (n-Way) | 115 | 75 | 30 | |||
PML-TX Remove Selections | 135 | 60 | 20 | |||
PML-TX Unroll Iteration | 123 | 60 | 25 | |||
PML-TX Parallelise Sequence | 123 | 50 | 25 | |||
Total | 2553 | 1933 | 1797 |
Here is the bid spreadsheet as of the end of our meeting today - please revise bids or not, as you see fit, and then let me know...
Have you decided if you are happy with your estimates?
Hi @andrewbutterfield,
I've attached the updates to our estimates. We’ve updated the estimates for the new features we talked about yesterday, would be quite interesting to see where we could take them. G5-Release-2-Backlog.xlsx
You've got them ! A G5-Release-2-Backlog.xlsx ny last comments?
Good to go!
On 23 March 2017 at 10:28, Andrew Butterfield notifications@github.com wrote:
You've got them ! A G5-Release-2-Backlog.xlsx https://github.com/tom-and-the-toothfairies/pathways/files/864377/G5-Release-2-Backlog.xlsx ny last comments?
— You are receiving this because you were assigned. Reply to this email directly, view it on GitHub https://github.com/tom-and-the-toothfairies/pathways/issues/139#issuecomment-288677363, or mute the thread https://github.com/notifications/unsubscribe-auth/AAIx_FN-jTABQ2fDCmMkLgsHvama1ysGks5roklmgaJpZM4Mctvh .
OK - can you close this issue - I can't
Notwithstanding the questions surrounding DINTO and timing, we should fill out the preliminary estimation form on Google Sheets
There is random data in there at the moment, with dainty statistical analysis ready to go.