@mostaphaRoudsari & @bhowes-tt Any suggestion how to remap Rvt schedule id to GBS one ? See below images
Revit Operating Schedule enum
in Revit GUI
GBS Operating Schedule enum
This is the correct enum for Operating Schedules http://revitapisearch.com/html/67ffcea7-1ebd-78c2-d8f3-b6cc5c3595d2.htm
I was able to create a GBS project with a different operating schedules and building types, I was able to run the analysis without a problem.
Closing here..
Barry suggested to set 1 for Operating Schedule Id whenever create a new project, 1 means "Default schedules based on Building Type specified"
I have a concern what if the user wants to run the analysis with a different operating schedule then the default one per building. The energy settings in Revit, the building type and schedules type can be set the value separately. Needs testing !