tt-acm / EnergyAnalysisForDynamo

Dynamo <> Autodesk Green Building Studio interoperability
Other
29 stars 18 forks source link

Operating Schedule IDs in GBS #29

Closed eertugrul closed 10 years ago

eertugrul commented 10 years ago

Barry suggested to set 1 for Operating Schedule Id whenever create a new project, 1 means "Default schedules based on Building Type specified"

I have a concern what if the user wants to run the analysis with a different operating schedule then the default one per building. The energy settings in Revit, the building type and schedules type can be set the value separately. Needs testing !

@mostaphaRoudsari what do u think ?

eertugrul commented 10 years ago

@mostaphaRoudsari & @bhowes-tt Any suggestion how to remap Rvt schedule id to GBS one ? See below images

Revit Operating Schedule enum image

in Revit GUI image

GBS Operating Schedule enum image

eertugrul commented 10 years ago

This is the correct enum for Operating Schedules http://revitapisearch.com/html/67ffcea7-1ebd-78c2-d8f3-b6cc5c3595d2.htm

I was able to create a GBS project with a different operating schedules and building types, I was able to run the analysis without a problem.

Closing here..