Closed Haddouch101 closed 12 months ago
Task | Progress | Date |
---|---|---|
Design and develop a GC | 100% | |
Subscribe to GBs | 100% | |
Coordinate with other GBs and GCs | 100% | |
Download data from WIS2 nodes | 100% | |
Provide metrics on system performance and data availability | 30% |
DWD installed a pilot system on premise consisting of external broker and data server and internal data handling systems. DWD expects the system to be ready for operations by 2024. As of February 15th the installation includes all available WIS2 data as well as a core data feed from Eumetsat and GTStoWIS2 traffic. The data is cached for six hours. So far the Cache is only subscribing to GB France.