Closed Haddouch101 closed 12 months ago
Task | Progress | Date |
---|---|---|
Design and develop a GC | 100% | March 2023 |
Subscribe to GBs | 100% | |
Coordinate with other GBs and GCs | 100% | |
Download data from WIS2 nodes | 100% | |
Provide metrics on system performance and data availability | 0% |
Risks and Issues Downloading traffic volume and latency should be monitored to achieve enough performance of GC It is difficult to estimate costs of operational system to be operational in 2025