Open raphj opened 5 months ago
I think you can rename this issue to be more general about live data of Migration results. Because 1st - the actions column doesn't start with the capital letters; next one, although migration was completed (Migration status of it is done), at the time, the number 1 is present in the column Is executed. And lastly, the Interrept button is displayed for the finished migration.
The button should be hidden for migrations that are not running.
On how to do it: ideally, a condition in the live data action should be used, but I don't know if it, but I'm not sure this is possible. A small javascript code could hide the button however.