The cdk-erigon job fails because there was a typo in the workflow file and since this PR relies on pull_request_target, it will fail until we merge the fix.
There's another issue since we upgraded the kurtosis version. Kurtosis now checks that port names follow the RFC-6335 standard. It means that port names should be maximum 15 characters long. However, some of the blockscout services names are too long (https://github.com/xavier-romero/kurtosis-blockscout/issues/4). Thus incremental fails because it deploys all the different components (note that pre-deployed-contracts also fails because it wrongly deploys all the components - this is fixed but it will reflect only after this PR has been merged).
Description
The ethereum-package has migrated from Kurtosis to the EF.
4.0.0
.0.90.1
.Notes:
The
cdk-erigon
job fails because there was a typo in the workflow file and since this PR relies on pull_request_target, it will fail until we merge the fix.There's another issue since we upgraded the kurtosis version. Kurtosis now checks that port names follow the RFC-6335 standard. It means that port names should be maximum 15 characters long. However, some of the blockscout services names are too long (https://github.com/xavier-romero/kurtosis-blockscout/issues/4). Thus
incremental
fails because it deploys all the different components (note thatpre-deployed-contracts
also fails because it wrongly deploys all the components - this is fixed but it will reflect only after this PR has been merged).References (if applicable)