-
National Grid and Statnett are building an interconnector ([1400MW](https://northsealink.com/)) between Great Britain and [South-West Norway](https://northsealink.com/en/locations/norway/) (should be …
-
See:
https://www.montelnews.com/en/story/tsos-begin-power-transfers-on-1-gw-france-uk-link/1167828
Time to add it to electricitymap?
-
Hi @MichaelKavanagh,
this is more of a data issue but maybe you know a solution: Is there a *complete* list of onshore wind units and their IDs somewhere? When downloading B1610 data, the PSR Type …
-
Today we start to get connection error from our cluster. (version 1.8.1)
kubectl cluster-info
Kubernetes master is running at https://elexon-poc-aks-e15aceb3.hcp.westeurope.azmk8s.io:443
Any h…
-
Hi @MichaelKavanagh !
I get a `TypeError: missing parameter NGCBMUnitID` when trying to call the B1610 API without this parameter specified. However, according to the official documentation this is…
-
Rather than relying on `paste0` calls, the URLs should be built using `httr` as a URL object
-
Hi @MichaelKavanagh,
it's me again. 😅 Just tried elexon v0.1.1 B1610 API with `v2` parameter as you suggested in #2. There seems to be a problem with the internal result parser because the `period`…
-
This was shared in Slack by ABerrow. I don't have much time to compare with our existing data source bmreports.com, so just pasting this here so it doesn't get forgotten:
> https://electricinsights…
jarek updated
4 years ago
-
Hi,
Why does UK battery storage show simply as a question mark?
The following link claims that "as of June 2019, there is currently 700MW of large scale battery storage installed in the UK" but …
-
`ELEXON.fetch_exchange` is failing because a new column has been introduced, to account for the Nemo Link interconnector between the UK and Belgium. This looks to [go live](http://www.nemo-link.com/ti…