-
### Feedback
A big issue with Amber Electric is that the price information does NOT include the network costs.
Can you please add some documentation to help users to write a template to include netw…
-
We should have logic that stations into:
Muja:
* Muja AB: 4 x 60MW
* Muja CD: 2 x 200 MW & 2 x 227 MW
Kwinana
* Coal generators
* Gas generators
Double check REL/GI parsers are doing this each tim…
-
- Update tech_name function of process.py to resolve 'Grid' field in `Fuel Source - Primary` as 'Battery Discharge'
-
-
Hi team, looks like the tracking stopped this morning at 1am? Not sure if bug or normal, thanks!
Thank you for your work on this project as well, it's amazing
-
JSON: https://data.opennem.org.au/v3/stats/au/NEM/NSW1/power/7d.json
* `data_type` should be `power`
* id should have `.power`
-
# Description
This CR is being raised to consult on the need of specific error codes required to deal with issues in data received by an energy data holder from the secondary data holder. The need f…
-
# Description
The payload size for the shared responsibility APIs 'Get usage for service point (SR)' and 'get usage for specific service points (SR)' will be quite substantial with the current propos…
-
We have 7 facilities with an unknown emissions intensity factor:
```
BIOGAS01 (Richgro) in WEM WEM with fueltech bioenergy_biogas is missing factor
HENDERSON_RENEWABLE_IG1 (Henderson) in WEM WEM …
-
# Problem Statement
Standards pertaining to how CDR Participants are to describe data clusters and permissions. Separated into AEMO-held and Retailer-held datasets.
Energy data language standard…
-
Originally raised here: https://twitter.com/expert_grass/status/1430720649220091912
QLD / NSW should interconnect should sum to zero between import and export.
![image](https://user-images.githu…