-
## What problem does this address?
Hardcoded screen width media queries like the 600px breakpoint for the core/columns block poses a not-insignificant problem for theme developers. We either have t…
-
Dear MXNet community,
I would like to start a conversation about the future of Apache MXNet and where we should head next.
# What we built
Apache MXNet is an open-source deep learning framewo…
-
Hey gang! Love the website and the idea behind it.
I wanted to do a dive into your site's frontend performance. Whereas I normally would call attention to things that would improve experience for t…
-
-
With Preact X being a great success there The 10.x release line was all about increasing ecosystem compatibility and the initiative was a complete success. Compared to Preact 8.x there are many more t…
-
In the most recent version (Version: f2.0.1v1.10.1-previous-304-g394da019 Commit hash: 394da01959ae09acca361dc2be0e559ca26829d4)
I get the following error and also no longer see a lora-dir argument…
-
**Is your feature request related to a problem? Please describe**
With Avalonia 0.10.0 we implemented Fluent theme, which was based on Windows 10 and WinUI 2.5 styles.
In 2021 we can see, that Mic…
-
## What problem does this address?
Block themes do a great job conditionally enqueueing only the CSS that is actually needed using inline `` tags. This is facilitated by the benefit of block themes g…
-
I am creating a plugin using Redux v4.5.0 and it returns an error on console when I am trying to add a new repeater section by clicking "Add"
Error: `Uncaught TypeError: Cannot read properties of u…
-
I'm try to trigger a rebuild of Sass every time a file is changed.
``` js
var metalsmith = require('metalsmith'),
path = require('path'),
markdown = require('metalsmith-markdown'),
templa…