-
I am trying to deploy using the asset pipeline. I am receiving the following message:
> Tasks: TOP => deploy:assets:precompile
> (See full trace by running task with --trace)
> The deploy has fai…
-
I host my blog at a sub-directory of my overall site, but sadly the theme seems to have misconfigured paths, as adding a subfolder to my baseURL causes the build process to fail thusly:
```
Error: e…
-
```
=== npm audit security report ===
# Run npm install @angular/core@17.0.8 to resolve 1 vul…
-
```
$ waybar -l debug
[2024-08-22 17:29:59.547] [debug] Try expanding: $XDG_CONFIG_HOME/waybar/config
[2024-08-22 17:29:59.547] [debug] Try expanding: $XDG_CONFIG_HOME/waybar/config.jsonc
[2024-08…
-
For a very large project with over 2k pages and 30+ layouts, we use [critical](https://github.com/nystudio107/rollup-plugin-critical) and that uses your library under the hood. Basically, it is possib…
-
Hi there. Recently I have upgraded to the last version available of the package but haven been able to produce the same output as before and need some advice.
### Expected behaviour
To produce the…
-
Hi,
**Do you want to request a *feature* or report a *bug*?**
Can this plugin work with timber and WordPress
**What is the current behavior?**
I would like to know if it is possible to cre…
-
### Your Environment
- Version used: 10.0.11 - revision 2080 (snap)
- Operating System and version: Ubuntu Linux 24.04.1 LTS (Noble Numbat)
- Desktop Environment: Gnome
### Expected Be…
-
I've written an `additionTask` for `critical css`:
```
additionalTasks: {
initialize(gulp, PATH_CONFIG, TASK_CONFIG) {
var projectDestPath = path.resolve(process.env.INIT_CWD, PATH_CON…
-
### Product
Commerce Hub
### Page
https://developer.fiserv.com/product/CommerceHub/docs/?path=docs/test.md&branch=preview
### Description
Developer Studio supported the following themes…