-
(as reported by Spring.GetUnitRadius)
-
It seems the cabling required to electrify the HOP's office windows was lost in all the cable changes.
-
Need to determine how to address scenario data compatibility problem 1st (each time we add output params, we break compatibility w/previously run scenarios).
-
When we have existing grid, we do not currently have a way to designate nodes as already electrified. And we don't guess whether they are or not by proximity to the grid. Practically, we are running…
-
When running NP on datasets for an entire country, GRID is chosen for many nodes that are only connected to 1 or 2 other nodes. This may be addressed by the "minimum node count per sub-network" param…
-
Currently it is not possible to change the share of bio-diesel in the diesel mixture for trains in the interface. Hence the only way to make trains 'greener' is by electrification. We should also allo…