-
## Description
It would be great to have a hook / a good place to attach some code after all pipelines have been registered but before the execution starts. I would like to do this for the sake of pe…
-
When DD testing has been done in the NHS Digital instance, training will be required to other DMDS staff.
DMDS have discussed with Data Products the set up of training environment.
Cath and Angie w…
-
### Contact Details
srichmond@es.net
### What should we build?
Please create reference documentation for the following topics on https://workfloworchestrator.org/orchestrator-core/ using the "how t…
-
ID: | R-T5.3-4
-- | --
Type: | PORTABILITY
User story: | As an Operations Engineer, I want to configure automatic scaling in a Docker based enviorement
Requirement: | The tool should be able…
-
ID: | R-T5.3-2
-- | --
Type: | FUNCTIONAL_SUITABILITY
User story: | As an Operations Engineer, I want to define auto scaling policies of my application
Requirement: | The tool must be able to …
-
we depend on the std-dev value in the ripsaw-fio-analyzed-result in ocs-ci to evaluate whether the data sample is valid before proceeding the validation of regression.
-
> How do we handle rollbacks and updates to tasks and jobs in our orchestrator?
By implementing version control and rollback mechanisms, such as storing previous versions of tasks and jobs and bein…
-
### Description
We are struggling to use the test orchestrator in our new test only module. We had it working fine when the tests were located in the app module.
One observation is that when worki…
-
Once a Keep is prepped, with microkernel, WASM runtime, etc., the workload (WASM binary) needs to be loaded into it. There are three ways this could be managed: which is our plan?
1. Enarx client …
-
Details of what the documentation should include can be found at https://github.com/build-trust/ockam/issues/4759
---
We love helping new contributors! ❤️
If you have questions or need help as you e…