-
On our call this morning, we made an attempt to cull issues from the [0.1.0 milestone](https://github.com/catalyst-cooperative/pudl/milestone/1) and... we didn't remove very much. It also seemed like …
-
In order to do this, I believe first we'll need to squish the multi-package bundle back into one package. This will require having more of a set list of possible data packages and potentially removing…
-
We have several different settings / configuration file types that we are using to control our scripts and automated processes, but nowhere do we have any documentation of what all those file types ar…
-
There's a bunch of code which is part of the MCOE calculations (heat rate, fuel cost, etc.) that isn't currently being tested in the Travis CI tests. We all clearly seem to prefer using the quicker t…
-
We want to allow various users to ingest only the data sets they care about. So we want to partition the ETL process such that anyone could ingest only the data sets that they are working on and only …
-
Once we are at the point of converting over fully to data packages, there will be lots of things we need to get rid of which reference the database that will no longer be relevant...
- [x] models! …
-
Along the lines of #260, we need to test the code that underlies the `epacems_to_parquet` console script that we are distributing. An initial attempt which tries to convert 1 year worth of Idaho data…
-
During ETL, PUDL pulls in raw data directly from a variety of sources, attempts to correct or at least identify reporting errors, normalizes and re-structures the data for easy to maintain storage in …
-
Create data packages containing all the main tables from the PUDL database and appropriate table schemas defining their relationships. This should include the data tables from:
- EIA 923
- EIA 860
…
-
**Describe the bug**
When no EIA tables are being loaded into PUDL (say, when it's just FERC Form 1 tables), the EIA entity harvesting process fails and halts the ETL.
**To Reproduce**
On a syste…