-
VOM and investment should be multiplied with the efficiency since the new data is in unit output.
## Checklist
- [ ] I am using the current [`master`](https://github.com/PyPSA/pypsa-eur/tree/mas…
-
## Checklist
- [x] I am using the current [`master`](https://github.com/PyPSA/pypsa-eur/tree/master) branch or the latest [release](https://github.com/PyPSA/pypsa-eur/releases). Please indicate…
Irieo updated
5 months ago
-
There are ~300 lines which are under construction (under_construction = True and num_parallel = 0), which leads to unwanted zeros in the DLR time series here:
https://github.com/PyPSA/pypsa-eur/blo…
fneum updated
6 months ago
-
-
## Convert everything into 2020-Euro instead of 2015-Euro
-
### Checklist
- [X] I am using the current [`master`](https://github.com/PyPSA/pypsa-usa/tree/master) branch
- [X] I am running on an up-to-date [`pypsa-usa` environment](https://github.com/PyPSA/pyp…
-
## Investment cost assumptions of electrolysis from DEA
Investment cost assumptions of DEA are very optimistic, especially for the near-term. Cost could be adjusted to a smaller plant size (1 M…
-
Awesome notebooks! Is there interest to convert the pyomo notebook to a linopy version?
Happy to work on this if you think it's useful
-
The EIA data format from our datasource changed. Suggestions
- Automatic download of EIA data OR update the EIA .csv file with hydro generation to new dataformat
- substitute the `vresutils` depende…
-
I think the answer is "no", but I just want to be sure, perhaps someone had success in using PyPSA-EUR on windows.
I can compile the tutorial (electricity) but if I try something larger I get:
1. A …