-
## :clipboard: 논문의 정보를 알려주세요.
- An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached/detached setup, machine release date and lag-time
…
-
## :clipboard: 논문의 정보를 알려주세요.
- An effective genetic algorithm for the flexible job-shop scheduling problem
- Guohui Zhang, Liang Gao, Yang Shi
- 2011-04
## :page_with_curl: Abstract(본문)
> In t…
-
## :clipboard: 논문의 정보를 알려주세요.
- Setup Change Scheduling for Semiconductor Packaging Facilities Using a Genetic Algorithm With an Operator Recommender
- Beom-suk Chung, Junseok Lim, In-Beom Park, Jon…
-
**Error:**
```
F0319 21:03:36.597392 1 main.go:355] Failed to get nodes from apiserver: Get https://dev-pisclk8s-f30ccea9.hcp.westus2.azmk8s.io:443/api/v1/nodes: dial tcp: i/o timeout
```
**…
-
krzku updated
6 years ago
-
When clicking thumbnails of screenshots (a base 64 image) added to report, the modal does not properly scale the image if it is too large to fit the screen. There is no way to scroll to the right to …