-
In WIS-Guide a monitor topic is mentioned, e.g. under 2.7.3.1 "...Global Broker will not discard the message but will send a message on the monitor topic hierarchy to inform the originating centre and…
-
In sections 3.5.2, 3.5.3, and 3.5.4 of the WIS 1 manual it mentions the **GISC area of responsibility**.
How is this definition expected to be implemented in a public-cloud based scenario?
If I reme…
-
**Introduction**
There are some anomalies in metadata syncing when a metadata is in different categories on different GISCs (this sometimes happens due to mistakes or incorrect workflow). Basically th…
-
**Summary and Purpose**
Gather feedback from GISCs when using [pywcmp](https://github.com/wmo-im/pywcmp) to quality assess WIS Metadata.
**Proposal**
Guide DWD colleagues to download, install, an…
-
This is a requirement by GISCs to have more constrained vocabularies. The work has to be done in close collaboration with GISCs.
-
Task allocated to ET - WIS Operations
... this will include reporting
... GISC Watch
... etc.
-
Need to determine what the procedures are for approving the implementation of WIS2 Global Services and WIS2 nodes to ensure that they are compliant to the WIS2 regulations.
Notes, this is separate fro…
-
small question
I notice that there has been some activity with metadata in recent months around the GISCs... so
What happens when a user has subscribed to some harvested metadata that is later remove…
-
There isn't any guidance on how to produce a metno with WSI and Vol C1 is not ready to register entries with WSI.
In WIS metno and Vol C1 should be replaced by functions of the GISC, but this is not …
-
{
"preferred_name": "Devyn",
"csulb_email": "devyn.yuhashi@student.csulb.edu",
"pronouns": "she/her/hers",
"previous_gis_experience": "coursework in undergrad and current work…