Closed dweindl closed 7 months ago
ReturnData::t_last
ReturnData::J
t_last
ReturnData::xdot
For two tests against pre-generated matlab results, the checks for J and xdot fail expectedly, since they are now evaluated at a different timepoint.
J
xdot
All modified and coverable lines are covered by tests :white_check_mark:
Project coverage is 78.27%. Comparing base (9824aba) to head (cc9bbfa).
9824aba
cc9bbfa
ReturnData::t_last
that holds the last solver timepoint (Closes #2246)ReturnData::J
is now the evaluted att_last
instead of the last successfully reached output timepoint (Closes #2334)ReturnData::xdot
is now the evaluted att_last
instead of the last successfully reached output timepointFor two tests against pre-generated matlab results, the checks for
J
andxdot
fail expectedly, since they are now evaluated at a different timepoint.