Closed ChingPangggg closed 6 years ago
06/15/2018 First test of flow rate (effluent): 0.4762 ml/s --> (need to adjust the height to reach 0.76 ml/s) Shortened the tubing between the T-connection and the fluoride tank
Since the first test is done with the waste line plugged in. If 10% of the flow goes into the waste line when it is open, meaning that with the waste line plugged in, the flow rate of the effluent should be (0.76 mL/s) /(90%)= 0.844 mL/s
Added Bars to the system to make sure the filled constant head tank and fluoride stock tank are stable.
Set up gravity powered system, fixed all leaks and structural instabilities. Adjusted height of fluoride constant head tank and height of sedimentation tube to achieve upflow velocity of 1.5 mm/s.
Tasks: