Sunday (3/10): Run tests on Design #1; hardware store run for bigger benchtop model
Tuesday(3/12): Drill hole in model UASB; Start tests on Design #2
Wednesday or Friday (3/13 or 3.15): Finish tests on Design #2
Sunday (3/17) Make symposium presentation
post 3/17: Inlet design. work on it
Sunday (3/10): Run tests on Design #1; hardware store run for bigger benchtop model Tuesday(3/12): Drill hole in model UASB; Start tests on Design #2 Wednesday or Friday (3/13 or 3.15): Finish tests on Design #2 Sunday (3/17) Make symposium presentation post 3/17: Inlet design. work on it