-How much head will HFFV need to function with?
-Sanding bushings at large scale, how short can they be? Cutting the tee/coupling as well for tighter fit
-Pipes from inlet to distribution tank to HFFV
-Implementing in pressure breaks as well to transfer info up to plant operator
-Fabricating and testing current design
Below is a picture of work done to find the true area of the gap between the bushing and the pipe
-How much head will HFFV need to function with? -Sanding bushings at large scale, how short can they be? Cutting the tee/coupling as well for tighter fit -Pipes from inlet to distribution tank to HFFV -Implementing in pressure breaks as well to transfer info up to plant operator -Fabricating and testing current design Below is a picture of work done to find the true area of the gap between the bushing and the pipe