Since the time to review code and work properly in general was lacking, most of the final features were already merged into a working development branch 'analysis'. A single pull request is therefore opened to merge all the work done so far. A list of added features and linked issues follows:
Since the time to review code and work properly in general was lacking, most of the final features were already merged into a working development branch 'analysis'. A single pull request is therefore opened to merge all the work done so far. A list of added features and linked issues follows:
32
17
5
20
10
23
25
24
26
19