This goal of this PR is to bring all the files in the repo up-to-date with a recent (today) run of the pipeline. Chla is fully drafted at this point. I did not re-do downloads for this, so they are from a point 1-2 weeks ago.
Lots of changes but only a couple lines of actual code that were changed (run.R). The rest is either bookdown-related items or summary files generated by the pipeline with each run.
This goal of this PR is to bring all the files in the repo up-to-date with a recent (today) run of the pipeline. Chla is fully drafted at this point. I did not re-do downloads for this, so they are from a point 1-2 weeks ago.
Lots of changes but only a couple lines of actual code that were changed (run.R). The rest is either bookdown-related items or summary files generated by the pipeline with each run.