Through using the MEP EPD dataset a few bugs were found:
1) The VAV EPD needs to be corrected to 1580.4 GWP (x 3600 to correct for seconds in an hour), the description also needs to be modified
2) The transformer EPD needs to be removed, the panel EPD should be used when a local transformer needs to be evaluated
3) A description should be added for Steel Conduit Sizing
4) A description should be added for Pipe Valve Sizing
Description:
Through using the MEP EPD dataset a few bugs were found: 1) The VAV EPD needs to be corrected to 1580.4 GWP (x 3600 to correct for seconds in an hour), the description also needs to be modified 2) The transformer EPD needs to be removed, the panel EPD should be used when a local transformer needs to be evaluated 3) A description should be added for Steel Conduit Sizing 4) A description should be added for Pipe Valve Sizing