Describe the bug
The x-axis for survey visualization is one day off. The last entered response is on June 8th, but it is plotted as June 7th on the axis.
Ideally, the last point on the axis should match with the last entered data.
The screen shot below shows the error in the visualization of PHQ-9 survey
Describe the bug The x-axis for survey visualization is one day off. The last entered response is on June 8th, but it is plotted as June 7th on the axis. Ideally, the last point on the axis should match with the last entered data.
The screen shot below shows the error in the visualization of PHQ-9 survey