Open Ryoken opened 3 years ago
In previous tickets, all trivial duplicate elements were removed:
https://github.com/BuildingSync/schema/issues/323 https://github.com/BuildingSync/schema/issues/324 https://github.com/BuildingSync/schema/issues/325
The remaining duplicates required non-trivial effort and their comments have been collected here:
AdvancedPowerStrip
AssemblyType
Building
CBECS
Capacity
ClimateZone
CommunicationProtocol
Control
ControlSensor
ControlStrategy
ControlSystemTypes
Controls
ConveyanceSystems
Facility
HeatPump
LampLabel
Manual
MeasureName
Other
OtherControlTechnology
Section
Site
SiteEnergyUse
SourceEnergyUse
Space
ThermalZone
Timer
WaterSideEconomizer
WaterUseType
In previous tickets, all trivial duplicate elements were removed:
https://github.com/BuildingSync/schema/issues/323 https://github.com/BuildingSync/schema/issues/324 https://github.com/BuildingSync/schema/issues/325
The remaining duplicates required non-trivial effort and their comments have been collected here:
AdvancedPowerStrip
AssemblyType
Building
CBECS
Capacity
ClimateZone
CommunicationProtocol
Control
ControlSensor
ControlStrategy
ControlSystemTypes
Controls
ConveyanceSystems
Facility
HeatPump
LampLabel
Manual
MeasureName
Other
OtherControlTechnology
Section
Site
SiteEnergyUse
SourceEnergyUse
Space
ThermalZone
Timer
WaterSideEconomizer
WaterUseType