OMB M-22-18 levies additional requirements related to the 800-53 SR control family. A review is likely warranted. These requirements might require 800-53 control statement augmentation (though the novel requirements might be subsumed within SR-1.a.1.b.
OMB M-22-18 levies additional requirements related to the 800-53 SR control family. A review is likely warranted. These requirements might require 800-53 control statement augmentation (though the novel requirements might be subsumed within SR-1.a.1.b.