COS420-Fall23 / Team-D

This is Team D's project repository. Shall be tackling the problem of helping graduates/students find a reliable job by cutting down the search method or type that other sites use.
3 stars 2 forks source link

Kanban #161

Closed DracoDrakthen closed 8 months ago

DracoDrakthen commented 8 months ago

Kanban board should show progress.

There should be 15-40 tasks for Deliverable 6 and Deliverable 5 revisions, each task should be small.

If < 20 tasks, -2.5 points

If any tasks are nonsensical or made just to get to 20, -10 points

If there are more than 1-2 tasks with the entire team assigned to them, -2.5 points for each

Each task should have the grading feedback/rubric information inside the task, for that task. The task assignee should have everything they need to know to do the task well, by just looking at the task. (Also for the quality checker).

-2 points for each task missing this

If no progress is shown, the grade for this part will be 0.