Need to check if the comments from Deliverable 1 have been addressed.
For any comment that is not addressed (every single one), deduct -2 points.
Fill in the rest of the sections, using information from the project description document.
See this example for an example of the minimum level of detail required.
Unlike this example, your section 4 should be organized into subsections, grouping by general feature area or top-level use cases (i.e. don’t have a sub section for every single use case that is an extension, or instance of)
Has about 15 – 30 functional requirements
If the number of FR is below 15, -10 points
Has about 10 – 15 non-functional requirements.
If the number of NFR is below 10, -10 points
For each wrong requirement deduct -2 points.
For each conflicting/contradictory requirement, deduct -2 points.
If the UI is missing deduct -10 points.
If the UI mockups are not updated significantly i.e. at least 50% more and prior ones improved, deduct -10 points. This is not only the designer's task but they should lead this.
If there's nothing else we can add to the other parts right now, then I believe it looks fine. We should keep in mind that we might be able to add some things later.
SRS ( /10)
Examples: Team E 2022 Team F 2022
Example Mockups: Team C 2022
Need to check if the comments from Deliverable 1 have been addressed.
For any comment that is not addressed (every single one), deduct -2 points.
Fill in the rest of the sections, using information from the project description document.
See this example for an example of the minimum level of detail required.
Unlike this example, your section 4 should be organized into subsections, grouping by general feature area or top-level use cases (i.e. don’t have a sub section for every single use case that is an extension, or instance of)
Has about 15 – 30 functional requirements
If the number of FR is below 15, -10 points
Has about 10 – 15 non-functional requirements.
If the number of NFR is below 10, -10 points
For each wrong requirement deduct -2 points.
For each conflicting/contradictory requirement, deduct -2 points.
If the UI is missing deduct -10 points.
If the UI mockups are not updated significantly i.e. at least 50% more and prior ones improved, deduct -10 points. This is not only the designer's task but they should lead this.
Use cases are required in a separate document.