COS420-Fall24 / TeamG

Money Gremlin, COS 420 F2024
1 stars 0 forks source link

Copy github backlog into product backlog #29

Closed Eric-Jestel closed 1 week ago

Eric-Jestel commented 2 weeks ago

Product Backlog ( /10)

Use this template. See example(s) here.

Product backlog and sprint backlog should match i.e. product backlog items in the sprint backlog need to have the same IDs etc. If they do not match deduct -2 points.

Make sure that all of your user stories are in the product backlog. For any missing user story deduct -1 point.

All columns based on the projects’ details document should be in the product backlog and must be filled out. For any missing column or missing information deduct -2 points. https://docs.google.com/spreadsheets/d/1kJWnub8Fge0k8kGHIsZaCx_7_wcmM76W/edit?gid=616909607#gid=616909607