CanberraOceanRacingClub / namadgi3

Maintenance management system for Namadgi 3
1 stars 2 forks source link

Mainsail - Reef No.1 Strop (at luff) Chaffing #683

Closed pcbaston closed 11 months ago

pcbaston commented 1 year ago

Please see pics of some chafing at the first reef cringle on the luff side of the main sail.

20230209_132020 20230209_131952 20230209_131933 20230209_131927

Sam arranged Roger (principal) form North Sail to fix, but he wanted the sail off and taken to his workshop adjacent marina.

pcbaston commented 1 year ago

Peter Ottesen and Chris Green inspected and think it is due to strop being jammed into sheave block when 1st reef pulled on hard. Shackle on strop goes into sheave block. Roger (North Sails) was called and came to inspect and proposed to replace with strop with dog bone (from rear) to shackle plus the installation of bobble/donut/parrel bead below shackle to act as a stop to keep shackle out of sheave. Strop to be made off-site and fitted without removal of mainsail. Parrel bead or spinnaker donut like these: PNP272A PNP197R

pcbaston commented 1 year ago

Roger (North Sails) fitted strop and forwarded invoice.

pcbaston commented 1 year ago

I've paid invoice NZD115 ex GST (AUD 108.65). Still waiting on a pic of strap to close.

pcbaston commented 1 year ago

Need to install a parcel bead/stop to reef line before shackle and confirm operation prior to closing. @smr547 @peterottesen @GarthBrice

pcbaston commented 11 months ago

Issue CLOSED