This is 1 of 2 alternatives where the scope area has been expanded beyond the original Ramsey St interchange. The interchange doesn't have to be exactly where the reference picture is! You will be working in coordination with #21 to move the mainline. Please see issue #40 for more information about the mainline adjustment.
Brief
This is issue serves as a general checklist for designing a minimum working prototype.
Resources
Alternative Pictures:
2023-2024 I-10 Project\06 - Joint Design Teams\02 - Design Team 2 (Zi)\_resources
IMPORTANT REFERENCE NOTE
This is 1 of 2 alternatives where the scope area has been expanded beyond the original Ramsey St interchange. The interchange doesn't have to be exactly where the reference picture is! You will be working in coordination with #21 to move the mainline. Please see issue #40 for more information about the mainline adjustment.
Brief
This is issue serves as a general checklist for designing a minimum working prototype.
Resources
Alternative Pictures:
2023-2024 I-10 Project\06 - Joint Design Teams\02 - Design Team 2 (Zi)\_resources
Task List
🚧 #28 Horizontal Geometry (Alignment) ❌ Vertical Geometry (Profile) ❌ Typical Section (Sections) ❌ Preliminary Caltrans Checklist Review ❌ Modeling (Corridor) ❌ Cut & Fill Volumes ❌ Data Aggregation & Model Polishing ❌ Pre-Production Cross-Team Caltrans Checklist Review ❌ Revision
❌Not Started 🚧Working ✅Done
Notes
Save your files here:
2023-2024 I-10 Project\06 - Joint Design Teams\02 - Design Team 2 (Zi)\[first_name]