Closed trontrytel closed 2 months ago
This PR adds the diameter size distribution functions and the upper bound of the diameter size distribution for 2M SB2006 scheme. They will be needed for the P3 scheme numerical integrals.
All modified and coverable lines are covered by tests :white_check_mark:
Project coverage is 96.99%. Comparing base (f30e789) to head (9401f8c).
f30e789
9401f8c
This PR adds the diameter size distribution functions and the upper bound of the diameter size distribution for 2M SB2006 scheme. They will be needed for the P3 scheme numerical integrals.