While placing Cee headers in Roof, when the LB wall is not present at 10'-0" (specified deck max span), as per our requirements we need to place the Cee headers at any LB present in between the max deck span & the previous LB wall deducted cee headers location.
After this if the add-in still does not find any LB wall in between the mentioned span then it needs to search for the NLB walls for cee headers placement.
But in this project, the add-in is automatically deducting the NLB wall for cee headers placement, even when it has the chance to place the cee headers at 5'-0" LB wall location instead of directly going to NLB wall option. Please take a look as the cee headers should be placed at grid 22 rather then the NLB walls between grids 22 & 23.
While placing Cee headers in Roof, when the LB wall is not present at 10'-0" (specified deck max span), as per our requirements we need to place the Cee headers at any LB present in between the max deck span & the previous LB wall deducted cee headers location.
After this if the add-in still does not find any LB wall in between the mentioned span then it needs to search for the NLB walls for cee headers placement.
But in this project, the add-in is automatically deducting the NLB wall for cee headers placement, even when it has the chance to place the cee headers at 5'-0" LB wall location instead of directly going to NLB wall option. Please take a look as the cee headers should be placed at grid 22 rather then the NLB walls between grids 22 & 23.
R:\Tickets\RA#54