CodeYourFuture / PD-curriculum

Track the PD content creation
0 stars 0 forks source link

JS3 Sprint 2 - update timings and coursework #143

Closed kfklein15 closed 5 months ago

kfklein15 commented 7 months ago

What type of request is it

**Is the change on:

Why do you want to suggest this update? Feedback from NW6 is that the PD content has time estimations that they cannot fulfil. They also mentioned that most of our coursework is set as mandatory, which it shouldn't.

Timing process suggestion

Coursework Per sprint we should have

Document necessary changes as a comment

alfonsocanuk commented 7 months ago

Hi there, please find reviewed timings on this document: https://docs.google.com/document/d/1z8VzoVuX9TXMbkfBCea83HL2rRcUnk7CskKORuziBKQ/edit?usp=sharing

Maybe either SWOT analysis or Linkedin Index task should be moved to stretch.

wainwmr commented 6 months ago

Hi @alfonsocanuk, I see that you are suggesting to leave most of the timings the same, but add an additional 30 minutes to the prep for JS3/ sprint 2. This would make the total of the prep (90 mins) + classwork for JS3/sprint 1 (180 mins) to be more than the 4 hours allowed. Are you imagining we would have to remove some of the JS3/sprint 1 coursework, or make it optional?

alfonsocanuk commented 6 months ago

That mkes sense. How about making these two optional?

Your SWOT analysis Resolving conflicts in your team

I think the other two are important and therefore we should keep them as mandatory. Just a thought.

I have made you an editor.

wainwmr commented 6 months ago

It is the coursework in sprint 1 that would have to be reduced or made stretch, not the coursework in sprint 2. However, I've looked again at your suggestion to increase the prep of sprint 2 to 90 minutes and I really think it can be left at 60 minutes. I really don't think they will take 35 minutes learning and creating a mind map, but instead they should be able to create it while reading/researching the four articles.

kfklein15 commented 5 months ago

Coursework: https://github.com/orgs/CodeYourFuture/projects/83/views/4?filterQuery=-status%3A%22%E2%9C%85+Done%22+pd

I changed the SWOT analysis to Stretch The Development plan is showing in week 1 for me, not week 2.

Updates done on CMS too.

Thanks both!