The user is able to enter a date, or time event into the system. The system understands and returns a prediction with this new fact.
Acceptance Criteria
1- Mean squared error lower than previous value
2- R2 value +/- 5% of previous value or greater
3- variance +/- 5% of previous value or greater
Description (not sure about input)
Scope of Work
Demo requirement
Acceptance Criteria 1- Mean squared error lower than previous value 2- R2 value +/- 5% of previous value or greater 3- variance +/- 5% of previous value or greater