DeeMcCart / DMC_Renovation_Tracker

Agile representation of house renovation project in Arklow Y14 N220 (Bayview)
0 stars 0 forks source link

User Story: As a builder I can assemble kitchen so that all cupboards and appliances are located correctly, all plumbing for sink and washing machine is connected, cooker is wired in, and worktops are fitted #18

Open DeeMcCart opened 10 months ago

DeeMcCart commented 10 months ago

EPIC: Kitchen - Build

As a kitchen fitter I can assemble kitchen so that all cupboards and appliances are located correctly, all plumbing for sink and washing machine is connected, cooker is wired in, and worktops are fitted

Acceptance Criteria Base units are fitted in located and secured Wall units are fitted inlocation and secured Sink and washing machine are plumbed in Cooker is wired in and working Worktops are installed and are smooth

Tasks Task 1: Check/ confirm proposed base unit positions (Sean, Sat 26th) Task 2: Secure base units to wall (Sean, Sat 26th) Task 3: Electrical - Wire in cooker (Sean, Sat 26th) Task 4: Electrical - blank off double socket above cooker Task 5: Test cooker (successful) (Sean, Sat 26th) Task 6: Plumbing - plumb in sink fresh cold water (Sean, Sat 26th) Task 7: Plumbing - plumb sink drain - main sink; half bowl (Sean, Sat 26th) Task 8: Plumbing - plumb in washing machine (Sean, Sat 26th) Task 9: Cut and shape existing worktop to new position and add edging joints (Sean, Sat 26th)