Departamento-de-Engenharia-Informatica / lei-24-s1-2nb-g321

0 stars 0 forks source link

As a Plant Floor Manager, I want to get the operations sequence as well as get the respective type of workstation, from a BOO of a given product, so i can know what sequences and workstaion it take to do the product #37

Open Diogo1210527 opened 1 month ago

Diogo1210527 commented 1 month ago

AC1: Minimum acceptance criteria: only the User Stories with data allowing their proper functioning will be evaluated. AC2: Minimum expected requirement: demonstrated with data imported from the legacy system. AC3: Minimum requirement above the expected: demonstrated with data provided for Sprint 1 evaluation.