[ ] The data model should cover the industrial facility’s activity described in the document, as well as any additional requirements resulting from the provided user stories.
[ ] Complete model in Visual Paradigm, including all connections and constraints, which allows the physical model script to be automatically generated.
[ ] The presentation of a conceptual model developed in Visual Paradigm in addition to the expected level.
Acceptance criteria: