EMBL-Design-Language / Sprint-2

Artifacts, project timeline, issues from the 2nd design sprint (13 September 2017)
0 stars 0 forks source link

Webpages #6

Open khawkins98 opened 7 years ago

khawkins98 commented 7 years ago

Parent ticket to (likely) do a whole navigable flow of low-fidelty:

Update 2 Oct: instead of generic pages, we're likely to test out 4 user flows.

khawkins98 commented 7 years ago

Sample nesting/relationships of these pages along with facets at: https://docs.google.com/drawings/d/1FkjXQIljhg1gzx3_XRCN9S6R76BT-jEv_iZ6juazvlM/edit

image

khawkins98 commented 7 years ago

The four flows to trial, and a representative list of sample pages/urls needed

https://github.com/EMBL-Design-Language/user-stories/issues/16 prototype user journey wireframes 1

https://github.com/EMBL-Design-Language/user-stories/issues/23 prototype user journey wireframes

https://github.com/EMBL-Design-Language/user-stories/issues/24 image

https://github.com/EMBL-Design-Language/user-stories/issues/29 image

If in principle that list of URL fragments looks ok, I'll start having a look at a structure to prototype them.