If the testjob is on shift end we need to close this stop first
If the Testjob has pending stops we have to copy and close the originals
but if there is a shift end stop we dont sum that time to the stops
If the tech dont have another testjob on working on it the reassignment stop will be closed
when the tech touch the "Continue button"
JobCompletation wasn't working as expected
-we redefine some querys
If we have two or more stops the method enter in a loop
The logic of the reassignment methods was modify
If the testjob is on shift end we need to close this stop first If the Testjob has pending stops we have to copy and close the originals but if there is a shift end stop we dont sum that time to the stops
If the tech dont have another testjob on working on it the reassignment stop will be closed when the tech touch the "Continue button"
JobCompletation wasn't working as expected -we redefine some querys If we have two or more stops the method enter in a loop