Overhead Three Phase Medium Voltage Line Switch-01

Is a line switch disconnect or load break? Or either? If load break, does it need a xfmr to power the switch?

jalsup commented 5 years ago

It can be either. load break does not mean it needs a xfr, that would be remotely controlled, scada controlled or programmable. Load break means is load break arcing horns on the switch or some other way of extinguishing the arc.. We do need diagrams of those, but these two diagrams look correct to me.

jalsup commented 5 years ago

@MichaelZeiler can you upload the original file, then we can close this.

MichaelZeiler commented 5 years ago

Just submitted pull request. In Electric > Distribution > Overhead Medium Voltage Three Phase Line Switch